Wastewater pump - List of Manufacturers, Suppliers, Companies and Products | IPROS

Wastewater pump Product List

1~2 item / All 2 items

Displayed results

A 'mini cactus' that can lower the reporting water level.

The "Mini Cactus" has been introduced as a low water level alarm device for the Sunny Speed Plus! It is possible to lower the alarm water level to 150 mm.

The Sanispeed Plus has an option called the "SaniSensor/SaniAlarm," which is a full water alarm device designed to prevent water leakage in case of a malfunction. When connecting drainage fixtures with low overflow edges, such as refrigerated showcase drain lines or indirect drainage, there may be instances where water overflows from the fixture before the alarm is triggered. In such cases, using a mini cactus can lower the alarm water level. <Usage Precautions> - Please do not wash with more than 10 liters temporarily to avoid false alarms. - Do not use detergents with concentrations higher than those specified by the manufacturer. - Please install the discharge pipe with a diameter of 25A. - This product is exclusively for Sanispeed Plus. *For inquiries or orders regarding the mini cactus, please feel free to contact us.

  • s4.jpg
  • s3.jpg
  • s2.jpg
  • s1.jpg
  • pump
  • Wastewater pump

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Office Building Tea Room | Case Study on the Adoption of Pressurized Drainage Pump Units

Introducing a case that completely overcomes layout restrictions with no underfloor piping space and no drilling allowed!

We would like to introduce a case where the "Zarai NPBW (ZA-100NPBW)" was installed in the tea room of an office building. In this case, there was a challenge of wanting to set up a tea room for a tenant on the first floor, but due to the OA floor, there was no space for underfloor piping, and it was also not possible to drill holes in the floor, which limited the layout. During the installation of the equipment, each inflow pipe was individually piped, using the connection points of four pump units. The piping route utilized the ceiling, with a discharge pipe rising 3 meters and running horizontally in the ceiling to connect to the existing drainage pipe. 【Case Overview (Partial)】 ■ Installation Location: Office Building Tea Room ■ Model: Zarai NPBW (ZA-100NPBW) ■ Connected Equipment: 2 sinks, coffee machine, water heater, ice maker *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration